Sunday

Sunday: Day 1

Notes:

  • Off The Wall Dilution

    • Really dirty use 1 part chemical to 3 parts warm water

    • Not that dirty use 1 part chemical to 5 parts warm water

    • Allow the product to dwell for at least 30 seconds, then follow with scrubbing on tougher soils and follow with high-pressure rinse.

Entry Arch+Presoak Arch+Foamers

(insert pictures)

20-25 minutes

2 Team Members

Tools:

  • Brush with long handle

  • Bucket

  • Soft bristle brush

  • Tunnel gun

  • Ladder

  • Second bucket for tip cleaner

  • Dawn soap

Steps:

  1. Gather all needed equipment.

  2. Fill bucket with dawn soap

  3. Using brush, clean all signs, sides, and Arch, including the top,

  4. Use a ladder to reach the top of the arches

  5. Use a bucket to soap the foamers for 20 minutes

  6. Use the green side of the scrub sponges

  7. Use tunnel gun to rinse the Arch, and signage

  8. Inspect foamer inserts and replace if necessary.

  9. Rinse all equipment used to return to the assigned location.

High speed doors

1st ⅓ of walls.

(insert pictures)

45-50 minutes

1 Team Members

Tools:

  • Brush with long handle

  • Bucket

  • Soft bristle brush

  • Prep gun gun

  • Ladder

  • Large green sponges

  • Dawn soap

  • Off the wall chemical* see dilution ratio above

  • Safety glasses

  • Nitrile gloves

Steps:

  1. Gather all needed equipment.

  2. Fill bucket with dawn soap

  3. Use the green side of the scrub sponges

  4. Use tunnel gun to rinse the Arch, and signage

  5. Rinse all equipment used to return to the assigned location.

Last updated